Triple

T2161452
Position Surface form Disambiguated ID Type / Status
Subject Andrew S. Grove E46808 entity
Predicate notableWork P4 FINISHED
Object High Output Management E44562 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: High Output Management | Statement: [Andrew S. Grove, notableWork, High Output Management]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: High Output Management
Context triple: [Andrew S. Grove, notableWork, High Output Management]
  • A. High Output Management chosen
    High Output Management is a highly influential business book by Intel co-founder Andrew S. Grove that applies manufacturing and engineering principles to practical, day-to-day management and leadership.
  • B. Cap of Maintenance
    The Cap of Maintenance is a traditional British ceremonial headpiece symbolizing royal authority and dignity, prominently used in major state occasions.
  • C. Advanced Queuing
    Advanced Queuing is Oracle Database’s built-in message queuing and workflow infrastructure for reliable, transactional, and asynchronous communication between applications.
  • D. Central Flow Management Unit
    The Central Flow Management Unit is a European air traffic management body responsible for coordinating and optimizing air traffic flow across Europe to ensure safety and efficiency in the use of airspace.
  • E. System Management Facilities
    System Management Facilities is a z/OS component that collects, records, and reports system and workload activity data to support performance monitoring, capacity planning, and problem analysis on IBM mainframes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a184cbc8190877791f6552c2484 completed March 4, 2026, 7:38 p.m.
NER Named-entity recognition batch_69abbe89e6ac8190b4b4bc0be4fe7aa9 completed March 7, 2026, 5:58 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae58ec0a7481909bc3e751de31e4d7 completed March 9, 2026, 5:21 a.m.
Created at: March 4, 2026, 7:45 p.m.