Triple

T21601377
Position Surface form Disambiguated ID Type / Status
Subject Wester Hailes towpath E533049 entity
Predicate instanceOf P0 FINISHED
Object pedestrian and cycling path C2290 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian and cycling path
Context triple: [Wester Hailes towpath, instanceOf, pedestrian and cycling path]
  • A. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • B. pedestrian network
    A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
  • C. rail trail
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • D. walking path chosen
    A walking path is a designated route or track intended for pedestrian use, providing a safe and accessible way for people to walk, exercise, or enjoy their surroundings.
  • E. waterfront greenway
    A waterfront greenway is a linear, publicly accessible open space along a body of water that combines pedestrian and bicycle paths with landscaping, recreation areas, and ecological features to connect communities and enhance shoreline environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46364608190a337dc8720dc2a35 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:33 p.m.