Triple

T2160030
Position Surface form Disambiguated ID Type / Status
Subject Calzada de los Misterios E47978 entity
Predicate connectsWith P37 FINISHED
Object Eje 1 Norte
Eje 1 Norte is a major east–west arterial road in Mexico City that forms part of the city’s primary ring and grid traffic system.
E240240 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eje 1 Norte | Statement: [Calzada de los Misterios, connectsWith, Eje 1 Norte]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eje 1 Norte
Context triple: [Calzada de los Misterios, connectsWith, Eje 1 Norte]
  • A. Eje 6 Sur
    Eje 6 Sur is a major east–west arterial road in Mexico City that runs through several neighborhoods, including Colonia del Valle.
  • B. Eje 5 Sur
    Eje 5 Sur is a major east–west arterial road in Mexico City that runs through several neighborhoods, including Colonia del Valle.
  • C. Easty
    Easty is the surname of Mary Easty, one of the women executed during the Salem witch trials in 1692.
  • D. Horizonte
    Horizonte is a municipality in the state of Ceará in northeastern Brazil, known for its growing industrial sector and proximity to the Fortaleza metropolitan area.
  • E. Noord
    Noord is a major river in the western Netherlands that forms part of the Rhine–Meuse–Scheldt delta and serves as an important waterway for regional shipping and transport.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Eje 1 Norte
Triple: [Calzada de los Misterios, connectsWith, Eje 1 Norte]
Generated description
Eje 1 Norte is a major east–west arterial road in Mexico City that forms part of the city’s primary ring and grid traffic system.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Eje 1 Norte
Target entity description: Eje 1 Norte is a major east–west arterial road in Mexico City that forms part of the city’s primary ring and grid traffic system.
  • A. Eje 6 Sur
    Eje 6 Sur is a major east–west arterial road in Mexico City that runs through several neighborhoods, including Colonia del Valle.
  • B. Eje 5 Sur
    Eje 5 Sur is a major east–west arterial road in Mexico City that runs through several neighborhoods, including Colonia del Valle.
  • C. Easty
    Easty is the surname of Mary Easty, one of the women executed during the Salem witch trials in 1692.
  • D. Horizonte
    Horizonte is a municipality in the state of Ceará in northeastern Brazil, known for its growing industrial sector and proximity to the Fortaleza metropolitan area.
  • E. Noord
    Noord is a major river in the western Netherlands that forms part of the Rhine–Meuse–Scheldt delta and serves as an important waterway for regional shipping and transport.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a1d1fd8819088b34990d69a712f completed March 4, 2026, 7:38 p.m.
NER Named-entity recognition batch_69abbe8894d481908eda9363fd36fea6 completed March 7, 2026, 5:58 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae58e9ceb08190871ff9c57ece23c0 completed March 9, 2026, 5:21 a.m.
NEDg Description generation batch_69ae5a3db428819083d73b4295c4e829 completed March 9, 2026, 5:27 a.m.
NED2 Entity disambiguation (via description) batch_69ae5a9b72188190bceb31975461206f completed March 9, 2026, 5:28 a.m.
Created at: March 4, 2026, 7:45 p.m.