Triple

T21587348
Position Surface form Disambiguated ID Type / Status
Subject Tobu ATS E532684 entity
Predicate instanceOf P0 FINISHED
Object automatic train stop system C3559 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: automatic train stop system
Context triple: [Tobu ATS, instanceOf, automatic train stop system]
  • A. train control system
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • B. railway signaling system chosen
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • C. terminal station
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • D. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • E. Amtrak station stop
    An Amtrak station stop is a designated location along an Amtrak rail route where trains halt to board and disembark passengers, often providing ticketing, waiting areas, and basic passenger services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46251648190876f0427cf2d321b completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:31 p.m.