Triple

T21572890
Position Surface form Disambiguated ID Type / Status
Subject POIC E532326 entity
Predicate worksWith P398 FINISHED
Object International Partner Control Centers
International Partner Control Centers are mission control facilities operated by NASA’s international space agency partners to coordinate and manage their contributions to human spaceflight missions such as those on the International Space Station.
E1491906 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: International Partner Control Centers | Statement: [POIC, worksWith, International Partner Control Centers]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: International Partner Control Centers
Context triple: [POIC, worksWith, International Partner Control Centers]
  • A. Intelligence and Operations Coordinating Centers
    Intelligence and Operations Coordinating Centers were regional command hubs used during the Vietnam War to coordinate intelligence gathering and counterinsurgency operations against the Viet Cong.
  • B. Centre for Collaboration with Surveillance Networks
    The Centre for Collaboration with Surveillance Networks is a specialized unit within Norway’s public health system that coordinates and strengthens national and international disease surveillance and data-sharing efforts.
  • C. Centre for Collaboration with Contingency Planning Networks
    The Centre for Collaboration with Contingency Planning Networks is a specialized unit within the Norwegian Institute of Public Health that coordinates and strengthens partnerships for emergency preparedness and response.
  • D. Centre for Collaboration with Security Networks
    The Centre for Collaboration with Security Networks is a specialized unit within the Norwegian Institute of Public Health that focuses on coordinating and strengthening cooperation with security and preparedness networks to protect public health.
  • E. Regional Data-processing Centres
    Regional Data-processing Centres are specialized facilities within the Global Data-processing and Forecasting System that collect, process, and analyze regional meteorological and related data to support weather forecasting and climate services.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: International Partner Control Centers
Triple: [POIC, worksWith, International Partner Control Centers]
Generated description
International Partner Control Centers are mission control facilities operated by NASA’s international space agency partners to coordinate and manage their contributions to human spaceflight missions such as those on the International Space Station.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: International Partner Control Centers
Target entity description: International Partner Control Centers are mission control facilities operated by NASA’s international space agency partners to coordinate and manage their contributions to human spaceflight missions such as those on the International Space Station.
  • A. Intelligence and Operations Coordinating Centers
    Intelligence and Operations Coordinating Centers were regional command hubs used during the Vietnam War to coordinate intelligence gathering and counterinsurgency operations against the Viet Cong.
  • B. Centre for Collaboration with Surveillance Networks
    The Centre for Collaboration with Surveillance Networks is a specialized unit within Norway’s public health system that coordinates and strengthens national and international disease surveillance and data-sharing efforts.
  • C. Centre for Collaboration with Contingency Planning Networks
    The Centre for Collaboration with Contingency Planning Networks is a specialized unit within the Norwegian Institute of Public Health that coordinates and strengthens partnerships for emergency preparedness and response.
  • D. Centre for Collaboration with Security Networks
    The Centre for Collaboration with Security Networks is a specialized unit within the Norwegian Institute of Public Health that focuses on coordinating and strengthening cooperation with security and preparedness networks to protect public health.
  • E. Regional Data-processing Centres
    Regional Data-processing Centres are specialized facilities within the Global Data-processing and Forecasting System that collect, process, and analyze regional meteorological and related data to support weather forecasting and climate services.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c4618bec8190bcb0feb74568cbb1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eee9ce230c81909e12bd59497e2237 completed April 27, 2026, 4:45 a.m.
NED1 Entity disambiguation (via context triple) batch_6a09f672b5808190a2dd61c26ce64403 completed May 17, 2026, 5:10 p.m.
NEDg Description generation batch_6a09f78a3d788190b4b19f3b6463550e completed May 17, 2026, 5:14 p.m.
NED2 Entity disambiguation (via description) batch_6a09f825b02c819096f57b1dba02ded2 completed May 17, 2026, 5:17 p.m.
Created at: April 16, 2026, 6:30 p.m.