Triple

T21550399
Position Surface form Disambiguated ID Type / Status
Subject McGill weather observatory E531744 entity
Predicate instanceOf P0 FINISHED
Object meteorological station C2066 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: meteorological station
Context triple: [McGill weather observatory, instanceOf, meteorological station]
  • A. meteorological infrastructure chosen
    Meteorological infrastructure comprises the interconnected network of instruments, stations, communication systems, and data-processing facilities used to observe, measure, and analyze atmospheric conditions for weather forecasting and climate monitoring.
  • B. meteorological data communication network
    A meteorological data communication network is a system of interconnected sensors, transmission links, and processing nodes that collect, transmit, and distribute weather and atmospheric data in real time.
  • C. surface-level station
    A surface-level station is a transit facility where passengers board and alight vehicles at or near ground level, typically featuring platforms, shelters, and access paths integrated with the surrounding streetscape.
  • D. meteorological organization
    A meteorological organization is an entity responsible for observing, analyzing, and forecasting atmospheric conditions to support weather prediction, climate monitoring, and related public and scientific services.
  • E. meteorological decision-support tool
    A meteorological decision-support tool is a system that integrates weather data, forecasts, and analytical models to help users make informed operational and strategic decisions based on atmospheric conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c460232c81908de2c3819d17c00e completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:28 p.m.