Triple

T21546543
Position Surface form Disambiguated ID Type / Status
Subject Comahue hydroelectric complex E531637 entity
Predicate partOf P40 FINISHED
Object Argentine national power system NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Argentine national power system | Statement: [Comahue hydroelectric complex, partOf, Argentine national power system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Argentine national power system
Context triple: [Comahue hydroelectric complex, partOf, Argentine national power system]
  • A. Argentine National Interconnected System chosen
    The Argentine National Interconnected System is the nationwide high-voltage electricity transmission network that links most of Argentina’s power plants with its regional distribution grids.
  • B. Chilean national power system
    The Chilean national power system is the interconnected electricity grid that generates, transmits, and distributes most of Chile’s electrical energy across the country.
  • C. South American power grid
    The South American power grid is the interconnected network of electricity generation, transmission, and distribution systems across South American countries, integrating major resources such as large hydroelectric complexes to supply power regionally.
  • D. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • E. Argentine railway system
    The Argentine railway system is the national network of passenger and freight rail lines that connects major cities and regions across Argentina and has historically played a central role in the country’s economic and territorial development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45f17148190949c330ab9c27706 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eeb58ef2548190a81ff51baba76e48 completed April 27, 2026, 1:02 a.m.
Created at: April 16, 2026, 6:28 p.m.