Triple
T21531868
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Uruguay vs Brazil (1950 FIFA World Cup) |
E531249
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | FIFA World Cup match |
C24673
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: FIFA World Cup match Context triple: [Uruguay vs Brazil (1950 FIFA World Cup), instanceOf, FIFA World Cup match]
-
A.
FIFA World Cup final
chosen
The FIFA World Cup final is the decisive match of the FIFA World Cup tournament in which the two remaining national teams compete to determine the world champion in men's international football.
-
B.
FIFA World Cup opening match
The FIFA World Cup opening match is the inaugural game of the tournament, typically featuring the host nation and marking the official start of the competition with heightened ceremony and global attention.
-
C.
FIFA World Cup tradition
A FIFA World Cup tradition is a recurring practice, ritual, or custom associated with the tournament that reflects its history, culture, and global fan experience.
-
D.
FIFA World Cup campaign
A FIFA World Cup campaign is the organized, multi-stage effort by a national football team and its association to qualify for, prepare for, and compete in a specific edition of the FIFA World Cup, encompassing strategic planning, player selection, training, matches, and promotional activities.
-
E.
soccer match
A soccer match is a competitive sporting event in which two teams of eleven players each attempt to score goals by advancing a ball into the opposing team’s net within a set period of time, following the rules of association football.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c45e5b8881908ac18fc2f493b114 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:27 p.m.