Triple

T21509321
Position Surface form Disambiguated ID Type / Status
Subject Georgia–Azerbaijan border E530674 entity
Predicate hasBorderCrossingWith P4105 FINISHED
Object Red Bridge border crossing NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Red Bridge border crossing | Statement: [Georgia–Azerbaijan border, hasBorderCrossingWith, Red Bridge border crossing]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Red Bridge border crossing
Context triple: [Georgia–Azerbaijan border, hasBorderCrossingWith, Red Bridge border crossing]
  • A. Giurgiu–Ruse Bridge border checkpoint
    The Giurgiu–Ruse Bridge border checkpoint is a major road and rail crossing point between Romania and Bulgaria, facilitating international traffic over the Danube via the Friendship Bridge.
  • B. Bogorodica border crossing
    Bogorodica border crossing is a major road checkpoint on the North Macedonia–Greece border near Gevgelija, serving as an important transit route between the two countries.
  • C. Dorohusk–Yahodyn border crossing
    The Dorohusk–Yahodyn border crossing is a major international road checkpoint between Poland and Ukraine, serving as an important route for passenger and freight traffic.
  • D. Gyueshevo border crossing
    Gyueshevo border crossing is a key checkpoint on the Bulgaria–North Macedonia border, serving as an important route for international road and rail traffic between the two countries.
  • E. Sallum border crossing
    Sallum border crossing is a key land border checkpoint between Egypt and Libya, serving as a major route for regional trade and travel across North Africa.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Red Bridge border crossing
Target entity description: Red Bridge border crossing is a major land checkpoint and transit route between Georgia and Azerbaijan, named after the historic red-brick bridge spanning the Khrami River.
  • A. Giurgiu–Ruse Bridge border checkpoint
    The Giurgiu–Ruse Bridge border checkpoint is a major road and rail crossing point between Romania and Bulgaria, facilitating international traffic over the Danube via the Friendship Bridge.
  • B. Bogorodica border crossing
    Bogorodica border crossing is a major road checkpoint on the North Macedonia–Greece border near Gevgelija, serving as an important transit route between the two countries.
  • C. Dorohusk–Yahodyn border crossing
    The Dorohusk–Yahodyn border crossing is a major international road checkpoint between Poland and Ukraine, serving as an important route for passenger and freight traffic.
  • D. Gyueshevo border crossing
    Gyueshevo border crossing is a key checkpoint on the Bulgaria–North Macedonia border, serving as an important route for international road and rail traffic between the two countries.
  • E. Sallum border crossing
    Sallum border crossing is a key land border checkpoint between Egypt and Libya, serving as a major route for regional trade and travel across North Africa.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45c81f08190a6b8bbb70a45aae7 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea84042481909b43a7a4c5d2336a completed April 23, 2026, 9:46 a.m.
Created at: April 16, 2026, 6:25 p.m.