Triple

T21485213
Position Surface form Disambiguated ID Type / Status
Subject Green Mountain Powerplant E530099 entity
Predicate isComponentOf P5722 FINISHED
Object Colorado-Big Thompson power system NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado-Big Thompson power system | Statement: [Green Mountain Powerplant, isComponentOf, Colorado-Big Thompson power system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Colorado-Big Thompson power system
Context triple: [Green Mountain Powerplant, isComponentOf, Colorado-Big Thompson power system]
  • A. Colorado-Big Thompson Project chosen
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • B. Donnells-Beardsley hydroelectric system
    The Donnells-Beardsley hydroelectric system is a hydroelectric power complex on California’s Stanislaus River that uses a series of dams, reservoirs, and powerhouses to generate electricity and support regional water management.
  • C. Mount Elbert Pumped-Storage Hydroelectric Project
    Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
  • D. Hetch Hetchy Power System
    The Hetch Hetchy Power System is a municipal hydroelectric power network that generates and delivers clean electricity to San Francisco and surrounding public facilities.
  • E. Snake River hydropower system
    The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:21 p.m.