Triple

T21471774
Position Surface form Disambiguated ID Type / Status
Subject Barrancas del Cobre E529748 entity
Predicate drainedBy P165 FINISHED
Object Fuerte River basin NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fuerte River basin | Statement: [Barrancas del Cobre, drainedBy, Fuerte River basin]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fuerte River basin
Context triple: [Barrancas del Cobre, drainedBy, Fuerte River basin]
  • A. Guavio River basin
    The Guavio River basin is a watershed in central Colombia that drains the eastern Andean slopes and supports regional ecosystems, agriculture, and hydroelectric generation.
  • B. Acelhuate River basin
    The Acelhuate River basin is a watershed in central El Salvador that drains much of the San Salvador metropolitan area and is known for severe urban pollution and flood risk.
  • C. Benito River basin
    The Benito River basin is the catchment area in Equatorial Guinea and Gabon that collects the waters of the Benito (Mbini) River and its tributaries before they flow into the Atlantic Ocean.
  • D. Arzobispo River basin
    The Arzobispo River basin is a watershed in Bogotá that drains part of the city’s Eastern Hills and contributes to its urban hydrological system.
  • E. Doce River basin
    The Doce River basin is the drainage area in southeastern Brazil that collects the waters of the Doce River and its tributaries, encompassing diverse ecosystems and numerous communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fuerte River basin
Target entity description: The Fuerte River basin is a major watershed in northwestern Mexico that collects runoff from the Sierra Madre Occidental, including the Barrancas del Cobre (Copper Canyon) region, before flowing to the Gulf of California.
  • A. Guavio River basin
    The Guavio River basin is a watershed in central Colombia that drains the eastern Andean slopes and supports regional ecosystems, agriculture, and hydroelectric generation.
  • B. Acelhuate River basin
    The Acelhuate River basin is a watershed in central El Salvador that drains much of the San Salvador metropolitan area and is known for severe urban pollution and flood risk.
  • C. Benito River basin
    The Benito River basin is the catchment area in Equatorial Guinea and Gabon that collects the waters of the Benito (Mbini) River and its tributaries before they flow into the Atlantic Ocean.
  • D. Arzobispo River basin
    The Arzobispo River basin is a watershed in Bogotá that drains part of the city’s Eastern Hills and contributes to its urban hydrological system.
  • E. Doce River basin
    The Doce River basin is the drainage area in southeastern Brazil that collects the waters of the Doce River and its tributaries, encompassing diverse ecosystems and numerous communities.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c459acb481909bb6ee452a0045c7 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea14756081908c615590c68904d5 completed April 23, 2026, 9:44 a.m.
Created at: April 16, 2026, 6:19 p.m.