Triple

T21456041
Position Surface form Disambiguated ID Type / Status
Subject Little Harquahala Pumping Plant E529339 entity
Predicate instanceOf P0 FINISHED
Object water-lifting facility C21652 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water-lifting facility
Context triple: [Little Harquahala Pumping Plant, instanceOf, water-lifting facility]
  • A. water-lifting device chosen
    A water-lifting device is a mechanism designed to raise water from a lower elevation to a higher one for purposes such as irrigation, supply, or drainage.
  • B. water-powered mill
    A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
  • C. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • D. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • E. water tower complex
    A water tower complex is a facility comprising one or more elevated storage tanks and associated infrastructure designed to store and distribute potable water using gravity-fed pressure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c458133481908ae8b41a12c4edec completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:08 p.m.