Triple

T21451791
Position Surface form Disambiguated ID Type / Status
Subject Maine State Route 25 E529225 entity
Predicate abbreviation P43 FINISHED
Object SR 25
SR 25 is a primary state highway in Maine that connects the Portland area with several inland communities to the west.
E1485677 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 25 | Statement: [Maine State Route 25, abbreviation, SR 25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 25
Context triple: [Maine State Route 25, abbreviation, SR 25]
  • A. SR 25
    SR 25 is a state highway in Alabama that serves as a regional connector route through several counties and communities.
  • B. SR 25
    SR 25 is a scenic two-lane state highway in California that runs through rural agricultural areas and the Diablo Range, often used as an alternative route between the Bay Area and the Central Coast.
  • C. SR 255
    SR 255 is a state highway in Maine that serves as a short connector route between local communities in Washington County.
  • D. SR 259
    SR 259 is a state highway in Maine that serves as a short connector route in the eastern part of the state.
  • E. SR 525
    SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 25
Triple: [Maine State Route 25, abbreviation, SR 25]
Generated description
SR 25 is a primary state highway in Maine that connects the Portland area with several inland communities to the west.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 25
Target entity description: SR 25 is a primary state highway in Maine that connects the Portland area with several inland communities to the west.
  • A. SR 25
    SR 25 is a state highway in Alabama that serves as a regional connector route through several counties and communities.
  • B. SR 25
    SR 25 is a scenic two-lane state highway in California that runs through rural agricultural areas and the Diablo Range, often used as an alternative route between the Bay Area and the Central Coast.
  • C. SR 255
    SR 255 is a state highway in Maine that serves as a short connector route between local communities in Washington County.
  • D. SR 259
    SR 259 is a state highway in Maine that serves as a short connector route in the eastern part of the state.
  • E. SR 525
    SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c457579481909db68053ed99750c completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9e9d33e648190864b0ef5acf36659 completed April 23, 2026, 9:43 a.m.
NED1 Entity disambiguation (via context triple) batch_6a09c90a182c8190881279e88394ff97 completed May 17, 2026, 1:56 p.m.
NEDg Description generation batch_6a09c9c2fbf081909f740049184552f0 completed May 17, 2026, 1:59 p.m.
NED2 Entity disambiguation (via description) batch_6a09cbae96a8819095c7e916fb93d65e completed May 17, 2026, 2:07 p.m.
Created at: April 16, 2026, 6:07 p.m.