Triple

T214461
Position Surface form Disambiguated ID Type / Status
Subject City Beautiful movement E4788 entity
Predicate instanceOf P0 FINISHED
Object urban planning movement C532 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban planning movement
Context triple: [City Beautiful movement, instanceOf, urban planning movement]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. agricultural movement
    An agricultural movement is a collective effort or organized campaign aimed at transforming farming practices, land use, or rural livelihoods to achieve social, economic, or environmental goals.
  • C. political movement
    A political movement is a collective effort by a group of people, often organized around shared ideas or grievances, seeking to influence or change government policies, social structures, or political power.
  • D. city
    A city is a densely populated, structured urban area characterized by extensive infrastructure, diverse economic activities, and complex social, cultural, and political systems.
  • E. intellectual movement chosen
    An intellectual movement is a collective shift in ideas, theories, and perspectives driven by a community of thinkers who challenge existing beliefs and shape cultural, scientific, or philosophical understanding over time.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2575cb1dc8190a01ad332426dc339 completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:52 a.m.