Triple

T21407693
Position Surface form Disambiguated ID Type / Status
Subject tower of St Mary-le-Bow (reconstruction work) E528081 entity
Predicate instanceOf P0 FINISHED
Object reconstruction project C32019 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reconstruction project
Context triple: [tower of St Mary-le-Bow (reconstruction work), instanceOf, reconstruction project]
  • A. architectural reconstruction project
    An architectural reconstruction project is a coordinated effort to research, design, and rebuild a damaged or lost structure to restore its historical, functional, or aesthetic integrity.
  • B. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. component of a reclamation project
    A component of a reclamation project is an individual physical, technical, or administrative element—such as infrastructure, process, or resource—that contributes to restoring, improving, or repurposing land, water, or other environmental assets.
  • D. church rebuilding project chosen
    A church rebuilding project is a coordinated effort to restore, reconstruct, or significantly renovate a church’s physical structure and facilities, often driven by structural needs, historical preservation, or community growth.
  • E. restatement-like project
    A restatement-like project is an organized effort to systematically synthesize, clarify, and codify existing rules, principles, or practices in a domain into a coherent, authoritative reference.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b520ee3c8190abddbee7e37e834c completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 5:32 p.m.