Triple

T21400580
Position Surface form Disambiguated ID Type / Status
Subject Inveruglas E527900 entity
Predicate near P350 FINISHED
Object Loch Sloy Hydro-Electric Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Loch Sloy Hydro-Electric Power Station | Statement: [Inveruglas, near, Loch Sloy Hydro-Electric Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Loch Sloy Hydro-Electric Power Station
Context triple: [Inveruglas, near, Loch Sloy Hydro-Electric Power Station]
  • A. Loch Doon hydroelectric schemes
    Loch Doon hydroelectric schemes are a series of hydroelectric power installations in southwest Scotland that harness water from Loch Doon and its associated waterways to generate electricity.
  • B. Rannoch power station
    Rannoch power station is a hydroelectric power facility in the Scottish Highlands that forms part of the Tummel Valley hydroelectric scheme operated by SSE.
  • C. Pitlochry Power Station
    Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
  • D. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • E. Ardnacrusha power station
    Ardnacrusha power station is a major hydroelectric power plant in County Clare, Ireland, renowned as one of the earliest and largest engineering projects of the Irish Free State.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Loch Sloy Hydro-Electric Power Station
Target entity description: Loch Sloy Hydro-Electric Power Station is a major post-war hydroelectric facility in the Scottish Highlands that harnesses water from Loch Sloy to generate electricity for the national grid.
  • A. Loch Doon hydroelectric schemes
    Loch Doon hydroelectric schemes are a series of hydroelectric power installations in southwest Scotland that harness water from Loch Doon and its associated waterways to generate electricity.
  • B. Rannoch power station
    Rannoch power station is a hydroelectric power facility in the Scottish Highlands that forms part of the Tummel Valley hydroelectric scheme operated by SSE.
  • C. Pitlochry Power Station
    Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
  • D. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • E. Ardnacrusha power station
    Ardnacrusha power station is a major hydroelectric power plant in County Clare, Ireland, renowned as one of the earliest and largest engineering projects of the Irish Free State.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b520ee3c8190abddbee7e37e834c completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69ee62d01634819089dd64fe7bc5ccbd completed April 26, 2026, 7:09 p.m.
Created at: April 16, 2026, 5:14 p.m.