Triple
T21394532
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lamu County |
E527743
|
entity |
| Predicate | partOfProject |
P10
|
FINISHED |
| Object | LAPSSET Corridor Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: LAPSSET Corridor Project | Statement: [Lamu County, partOfProject, LAPSSET Corridor Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: LAPSSET Corridor Project Context triple: [Lamu County, partOfProject, LAPSSET Corridor Project]
-
A.
Corridor X (Pan-European Corridor X)
Corridor X (Pan-European Corridor X) is a major trans-European transport route connecting Central Europe with the Balkans and the Aegean Sea, facilitating significant international road and rail traffic.
-
B.
Berbera Corridor road project
The Berbera Corridor road project is a major infrastructure initiative to upgrade and connect transport routes from the Port of Berbera to inland markets, enhancing regional trade and logistics.
-
C.
Baltic coast transport corridor
The Baltic coast transport corridor is a major transnational route along the southern Baltic Sea that facilitates regional and international trade and travel between coastal cities and ports.
-
D.
Panke green corridor
Panke green corridor is an urban greenway along the Panke River in Berlin, offering residents and visitors natural landscapes, walking and cycling paths, and recreational spaces.
-
E.
Saburtalo Line
The Saburtalo Line is one of the main rapid transit lines of the Tbilisi Metro system in Tbilisi, Georgia, serving several central and residential districts of the city.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: LAPSSET Corridor Project Target entity description: The LAPSSET Corridor Project is a major Kenyan infrastructure initiative aimed at connecting Lamu Port to Ethiopia and South Sudan through a network of roads, railways, pipelines, and related developments to spur regional economic growth.
-
A.
Corridor X (Pan-European Corridor X)
Corridor X (Pan-European Corridor X) is a major trans-European transport route connecting Central Europe with the Balkans and the Aegean Sea, facilitating significant international road and rail traffic.
-
B.
Berbera Corridor road project
The Berbera Corridor road project is a major infrastructure initiative to upgrade and connect transport routes from the Port of Berbera to inland markets, enhancing regional trade and logistics.
-
C.
Baltic coast transport corridor
The Baltic coast transport corridor is a major transnational route along the southern Baltic Sea that facilitates regional and international trade and travel between coastal cities and ports.
-
D.
Panke green corridor
Panke green corridor is an urban greenway along the Panke River in Berlin, offering residents and visitors natural landscapes, walking and cycling paths, and recreational spaces.
-
E.
Saburtalo Line
The Saburtalo Line is one of the main rapid transit lines of the Tbilisi Metro system in Tbilisi, Georgia, serving several central and residential districts of the city.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b51ff3748190935c0a513c62a12b |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e8b117d8c881908b823c1212b5b919 |
completed | April 22, 2026, 11:29 a.m. |
Created at: April 16, 2026, 5:13 p.m.