Triple

T2139112
Position Surface form Disambiguated ID Type / Status
Subject Chandrayaan-2 E46720 entity
Predicate instanceOf P0 FINISHED
Object lunar exploration mission C1385 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lunar exploration mission
Context triple: [Chandrayaan-2, instanceOf, lunar exploration mission]
  • A. lunar exploration program chosen
    A lunar exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study, visit, and potentially utilize the Moon’s environment and resources.
  • B. lunar landing mission
    A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
  • C. planetary exploration program
    A planetary exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study other planets and celestial bodies using robotic or crewed spacecraft.
  • D. space probe
    A space probe is an unmanned spacecraft designed to travel beyond Earth's orbit to collect scientific data about other celestial bodies and the space environment.
  • E. Mars mission engineering activity
    Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a174ab48190a5db20c132e5dccf completed March 4, 2026, 7:37 p.m.
Created at: March 4, 2026, 7:44 p.m.