Triple

T21382893
Position Surface form Disambiguated ID Type / Status
Subject Interstate 184 E527407 entity
Predicate hasLocalName P6353 FINISHED
Object Boise Connector NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boise Connector | Statement: [Interstate 184, hasLocalName, Boise Connector]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boise Connector
Context triple: [Interstate 184, hasLocalName, Boise Connector]
  • A. Carson City–Dayton corridor
    The Carson City–Dayton corridor is a key transportation and development route in western Nevada linking the state capital, Carson City, with the Dayton area and surrounding communities.
  • B. Empire Corridor
    The Empire Corridor is a major passenger rail route in New York State, running from New York City through the Hudson Valley and up to cities such as Albany and Buffalo.
  • C. Redmond Central Connector
    Redmond Central Connector is an urban trail and linear park in Redmond, Washington, built along a former rail corridor to link regional bike and pedestrian routes with the city’s downtown and public spaces.
  • D. Yakima Valley transportation corridor
    The Yakima Valley transportation corridor is a major travel and freight route in south-central Washington State that links agricultural communities and regional cities through highways, rail lines, and supporting infrastructure.
  • E. Paulina Connector
    Paulina Connector is a short elevated rail link in Chicago that connects segments of the city's rapid transit system, facilitating train movements and route flexibility.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Boise Connector
Target entity description: The Boise Connector is a short auxiliary freeway in Boise, Idaho, that links Interstate 84 with downtown Boise.
  • A. Carson City–Dayton corridor
    The Carson City–Dayton corridor is a key transportation and development route in western Nevada linking the state capital, Carson City, with the Dayton area and surrounding communities.
  • B. Empire Corridor
    The Empire Corridor is a major passenger rail route in New York State, running from New York City through the Hudson Valley and up to cities such as Albany and Buffalo.
  • C. Redmond Central Connector
    Redmond Central Connector is an urban trail and linear park in Redmond, Washington, built along a former rail corridor to link regional bike and pedestrian routes with the city’s downtown and public spaces.
  • D. Yakima Valley transportation corridor
    The Yakima Valley transportation corridor is a major travel and freight route in south-central Washington State that links agricultural communities and regional cities through highways, rail lines, and supporting infrastructure.
  • E. Paulina Connector
    Paulina Connector is a short elevated rail link in Chicago that connects segments of the city's rapid transit system, facilitating train movements and route flexibility.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51f363c8190944000ab5523b02b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8b0f05278819096c511035ffc9777 completed April 22, 2026, 11:28 a.m.
Created at: April 16, 2026, 5:12 p.m.