Triple

T21381908
Position Surface form Disambiguated ID Type / Status
Subject Novokuznetsk E527378 entity
Predicate hasPowerPlant P9904 FINISHED
Object Novokuznetskaya GRES
Novokuznetskaya GRES is a thermal power station serving the industrial city of Novokuznetsk in Russia’s Kemerovo Oblast, contributing significantly to the region’s electricity and heat supply.
E1481309 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Novokuznetskaya GRES | Statement: [Novokuznetsk, hasPowerPlant, Novokuznetskaya GRES]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Novokuznetskaya GRES
Context triple: [Novokuznetsk, hasPowerPlant, Novokuznetskaya GRES]
  • A. Novosibirsk Hydroelectric Power Plant
    Novosibirsk Hydroelectric Power Plant is a major hydroelectric facility on the Ob River in Russia, providing electricity and regulating water levels for the surrounding Novosibirsk region.
  • B. Irkutsk Hydroelectric Power Station
    Irkutsk Hydroelectric Power Station is a major Soviet-era hydroelectric dam and power plant on the Angara River that supplies electricity and helps regulate water levels for the Irkutsk region in Siberia, Russia.
  • C. Krasnoyarsk hydroelectric power station
    The Krasnoyarsk hydroelectric power station is a major Soviet-era dam and power plant on the Yenisei River in Siberia, known for its massive installed capacity and role in regional industrial development.
  • D. Balakovo Nuclear Power Plant
    Balakovo Nuclear Power Plant is a major Russian nuclear power station on the Volga River, known as one of the country’s largest producers of nuclear-generated electricity.
  • E. Beloyarsk Nuclear Power Station
    Beloyarsk Nuclear Power Station is a Russian nuclear power plant in Sverdlovsk Oblast known for its experimental and commercial fast breeder reactors, including the BN-series units.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Novokuznetskaya GRES
Triple: [Novokuznetsk, hasPowerPlant, Novokuznetskaya GRES]
Generated description
Novokuznetskaya GRES is a thermal power station serving the industrial city of Novokuznetsk in Russia’s Kemerovo Oblast, contributing significantly to the region’s electricity and heat supply.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Novokuznetskaya GRES
Target entity description: Novokuznetskaya GRES is a thermal power station serving the industrial city of Novokuznetsk in Russia’s Kemerovo Oblast, contributing significantly to the region’s electricity and heat supply.
  • A. Novosibirsk Hydroelectric Power Plant
    Novosibirsk Hydroelectric Power Plant is a major hydroelectric facility on the Ob River in Russia, providing electricity and regulating water levels for the surrounding Novosibirsk region.
  • B. Irkutsk Hydroelectric Power Station
    Irkutsk Hydroelectric Power Station is a major Soviet-era hydroelectric dam and power plant on the Angara River that supplies electricity and helps regulate water levels for the Irkutsk region in Siberia, Russia.
  • C. Krasnoyarsk hydroelectric power station
    The Krasnoyarsk hydroelectric power station is a major Soviet-era dam and power plant on the Yenisei River in Siberia, known for its massive installed capacity and role in regional industrial development.
  • D. Balakovo Nuclear Power Plant
    Balakovo Nuclear Power Plant is a major Russian nuclear power station on the Volga River, known as one of the country’s largest producers of nuclear-generated electricity.
  • E. Beloyarsk Nuclear Power Station
    Beloyarsk Nuclear Power Station is a Russian nuclear power plant in Sverdlovsk Oblast known for its experimental and commercial fast breeder reactors, including the BN-series units.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51f363c8190944000ab5523b02b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8b0cf89f08190bd7c0d552232d948 completed April 22, 2026, 11:28 a.m.
NED1 Entity disambiguation (via context triple) batch_6a09b426553881909477ea3902819672 completed May 17, 2026, 12:27 p.m.
NEDg Description generation batch_6a09b5e6d1ac8190aeec88859d17d257 completed May 17, 2026, 12:34 p.m.
NED2 Entity disambiguation (via description) batch_6a09b699fef081909797a5fc50814cb9 completed May 17, 2026, 12:37 p.m.
Created at: April 16, 2026, 5:12 p.m.