Triple

T2137046
Position Surface form Disambiguated ID Type / Status
Subject Ashford E46676 entity
Predicate roadConnection P385 FINISHED
Object A28 road
The A28 road is a major route in southeast England that runs through Kent and East Sussex, linking towns such as Ashford and Canterbury.
E573149 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A28 road | Statement: [Ashford, roadConnection, A28 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A28 road
Context triple: [Ashford, roadConnection, A28 road]
  • A. A29 road
    The A29 road is a primary route in southern England that runs through West Sussex, connecting several towns and providing an important north–south link between the South Downs and the coastal areas.
  • B. A22 road
    The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
  • C. A25 road
    The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
  • D. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • E. A27 road
    The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A28 road
Triple: [Ashford, roadConnection, A28 road]
Generated description
The A28 road is a major route in southeast England that runs through Kent and East Sussex, linking towns such as Ashford and Canterbury.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A28 road
Target entity description: The A28 road is a major route in southeast England that runs through Kent and East Sussex, linking towns such as Ashford and Canterbury.
  • A. A29 road
    The A29 road is a primary route in southern England that runs through West Sussex, connecting several towns and providing an important north–south link between the South Downs and the coastal areas.
  • B. A22 road
    The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
  • C. A25 road
    The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
  • D. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • E. A27 road
    The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a174ab48190a5db20c132e5dccf completed March 4, 2026, 7:37 p.m.
NER Named-entity recognition batch_69abbdff9254819094d27405478e29a0 completed March 7, 2026, 5:56 a.m.
NED1 Entity disambiguation (via context triple) batch_69c140fc97f48190aa77fb32ccd658ab completed March 23, 2026, 1:32 p.m.
NEDg Description generation batch_69c1460fead08190ae80e7c130753a73 completed March 23, 2026, 1:54 p.m.
NED2 Entity disambiguation (via description) batch_69c1466aeccc8190b541915bc041c6cc completed March 23, 2026, 1:55 p.m.
Created at: March 4, 2026, 7:44 p.m.