Triple
T21367679
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mount Mayday |
E526962
|
entity |
| Predicate | category |
P87
|
FINISHED |
| Object | Walt Disney World icon |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Walt Disney World icon | Statement: [Mount Mayday, category, Walt Disney World icon]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Walt Disney World icon Context triple: [Mount Mayday, category, Walt Disney World icon]
-
A.
Walt Disney World Resort
Walt Disney World Resort is a massive entertainment complex near Orlando known for its theme parks, resorts, and attractions operated by The Walt Disney Company.
-
B.
Walt Disney World pavilions
Walt Disney World pavilions are themed areas within the resort’s parks that showcase specific countries, concepts, or brands through attractions, dining, and immersive design.
-
C.
Walt Disney Studios Park
Walt Disney Studios Park is a movie-themed amusement park at Disneyland Paris that immerses visitors in the worlds of Disney, Pixar, and Hollywood-style filmmaking through rides, shows, and studio-inspired attractions.
-
D.
Walt Disney World transportation system
The Walt Disney World transportation system is a vast, integrated network of buses, monorails, boats, gondolas, and walkways that move guests between the resort’s theme parks, hotels, and other destinations.
-
E.
Disney Resort
Disney Resort is a large Disney-themed entertainment complex in Shanghai featuring a theme park, hotels, and shopping and dining areas.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Walt Disney World icon Target entity description: Mount Mayday is the central, shipwreck-topped volcanic peak that serves as the visual and thematic centerpiece of Disney’s Typhoon Lagoon water park at Walt Disney World.
-
A.
Walt Disney World Resort
Walt Disney World Resort is a massive entertainment complex near Orlando known for its theme parks, resorts, and attractions operated by The Walt Disney Company.
-
B.
Walt Disney World pavilions
Walt Disney World pavilions are themed areas within the resort’s parks that showcase specific countries, concepts, or brands through attractions, dining, and immersive design.
-
C.
Walt Disney Studios Park
Walt Disney Studios Park is a movie-themed amusement park at Disneyland Paris that immerses visitors in the worlds of Disney, Pixar, and Hollywood-style filmmaking through rides, shows, and studio-inspired attractions.
-
D.
Walt Disney World transportation system
The Walt Disney World transportation system is a vast, integrated network of buses, monorails, boats, gondolas, and walkways that move guests between the resort’s theme parks, hotels, and other destinations.
-
E.
Disney Resort
Disney Resort is a large Disney-themed entertainment complex in Shanghai featuring a theme park, hotels, and shopping and dining areas.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b51e80808190ba5cb05667af02a9 |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69ee5bae5eb88190be6d9ff4dc03d52b |
completed | April 26, 2026, 6:38 p.m. |
Created at: April 16, 2026, 5:09 p.m.