Triple

T21358879
Position Surface form Disambiguated ID Type / Status
Subject Austin, Chicago E526711 entity
Predicate hasMajorStreet P30026 FINISHED
Object Austin Boulevard NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Austin Boulevard | Statement: [Austin, Chicago, hasMajorStreet, Austin Boulevard]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Austin Boulevard
Context triple: [Austin, Chicago, hasMajorStreet, Austin Boulevard]
  • A. Austin Boulevard
    Austin Boulevard is a major roadway in Island Park, New York, serving as a primary thoroughfare connecting the village to surrounding areas.
  • B. Austin Boulevard chosen
    Austin Boulevard is a major east–west thoroughfare in Chicago that serves as a key boundary and connector for the city’s Austin neighborhood.
  • C. Austin Road West
    Austin Road West is a major thoroughfare in Hong Kong’s West Kowloon area, connecting key commercial, residential, and cultural zones near the harbourfront.
  • D. Wilson Boulevard
    Wilson Boulevard is a major arterial street in Arlington, Virginia, lined with shops, restaurants, and offices and serving as a key east–west corridor through several urban neighborhoods.
  • E. Orange Avenue
    Orange Avenue is a major thoroughfare in Orlando, Florida, known for running through the city’s downtown core and serving as a central commercial and cultural corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51d8a308190b09113b3b3f9bc15 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8afa3924c8190b3decbfda4a2aecf completed April 22, 2026, 11:23 a.m.
Created at: April 16, 2026, 5:07 p.m.