Triple

T21358653
Position Surface form Disambiguated ID Type / Status
Subject Laurel County, Kentucky E526706 entity
Predicate majorHighway P385 FINISHED
Object Kentucky Route 80 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kentucky Route 80 | Statement: [Laurel County, Kentucky, majorHighway, Kentucky Route 80]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kentucky Route 80
Context triple: [Laurel County, Kentucky, majorHighway, Kentucky Route 80]
  • A. Kentucky Route 80 chosen
    Kentucky Route 80 is a major east–west highway spanning much of Kentucky, connecting numerous towns and cities across the southern part of the state.
  • B. Kentucky Route 88
    Kentucky Route 88 is a state highway in Kentucky that serves as an important east–west connector through rural communities, including parts of Hart County.
  • C. Kentucky Route 90
    Kentucky Route 90 is a significant east–west state highway in south-central Kentucky that connects several communities and serves as a key regional transportation corridor.
  • D. Kentucky Route 70
    Kentucky Route 70 is an east–west state highway in Kentucky that spans much of the state, connecting numerous small towns and rural areas.
  • E. Kentucky Route 84
    Kentucky Route 84 is a state highway in Kentucky that runs through central parts of the state, connecting communities such as Hodgenville and serving as a regional connector route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51d8a308190b09113b3b3f9bc15 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8afa3924c8190b3decbfda4a2aecf completed April 22, 2026, 11:23 a.m.
Created at: April 16, 2026, 5:07 p.m.