Triple
T2135256
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rumsey Woods |
E46635
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban parkland |
C218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban parkland Context triple: [Rumsey Woods, instanceOf, urban parkland]
-
A.
urban park
chosen
An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
-
B.
urban public space
An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
-
C.
urban conservation area
An urban conservation area is a designated part of a city where the historic, architectural, and environmental character is protected and managed through specific planning and development controls.
-
D.
county park
A county park is a publicly accessible natural or recreational area owned and managed by a county government, providing outdoor spaces, facilities, and activities for community use.
-
E.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88a174ab48190a5db20c132e5dccf |
completed | March 4, 2026, 7:37 p.m. |
Created at: March 4, 2026, 7:44 p.m.