Triple

T21311696
Position Surface form Disambiguated ID Type / Status
Subject A683 road E525353 entity
Predicate roadNumber P1864 FINISHED
Object A683
A683 is a primary road in northern England that runs between the city of Lancaster and the town of Kirkby Stephen, passing through parts of Lancashire and Cumbria.
E1477357 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A683 | Statement: [A683 road, roadNumber, A683]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A683
Context triple: [A683 road, roadNumber, A683]
  • A. A682
    The A682 is a primary road in northern England that runs through Lancashire and North Yorkshire, linking towns such as Rawtenstall and serving as a key route across the Pennines.
  • B. A680
    The A680 is a road in North West England that connects towns in Lancashire and Greater Manchester, including passing through Edenfield.
  • C. A628
    A628 is a major trans-Pennine road in northern England that connects South Yorkshire with Greater Manchester via the Woodhead Pass.
  • D. A865
    A865 is a primary road on the Outer Hebridean island of North Uist in Scotland, forming a key part of the island’s transport network.
  • E. A83
    A83 is a French autoroute in western France that connects the Nantes region to the A10 and forms part of a major north–south motorway corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A683
Triple: [A683 road, roadNumber, A683]
Generated description
A683 is a primary road in northern England that runs between the city of Lancaster and the town of Kirkby Stephen, passing through parts of Lancashire and Cumbria.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A683
Target entity description: A683 is a primary road in northern England that runs between the city of Lancaster and the town of Kirkby Stephen, passing through parts of Lancashire and Cumbria.
  • A. A682
    The A682 is a primary road in northern England that runs through Lancashire and North Yorkshire, linking towns such as Rawtenstall and serving as a key route across the Pennines.
  • B. A680
    The A680 is a road in North West England that connects towns in Lancashire and Greater Manchester, including passing through Edenfield.
  • C. A628
    A628 is a major trans-Pennine road in northern England that connects South Yorkshire with Greater Manchester via the Woodhead Pass.
  • D. A865
    A865 is a primary road on the Outer Hebridean island of North Uist in Scotland, forming a key part of the island’s transport network.
  • E. A83
    A83 is a French autoroute in western France that connects the Nantes region to the A10 and forms part of a major north–south motorway corridor.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b518b8948190ad69cf9a8784d397 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e75dca66ac8190a5f0a372a9bc25a7 completed April 21, 2026, 11:21 a.m.
NED1 Entity disambiguation (via context triple) batch_6a099ed968d88190aa274406beb46e87 completed May 17, 2026, 10:56 a.m.
NEDg Description generation batch_6a099fb54c00819083422ecadd9aa1f5 completed May 17, 2026, 11 a.m.
NED2 Entity disambiguation (via description) batch_6a09a0242a94819095af1689fe5aea0a completed May 17, 2026, 11:01 a.m.
Created at: April 16, 2026, 4:17 p.m.