Triple
T2130360
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ruxley Gravel Pits |
E46522
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former gravel pit |
—
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former gravel pit Context triple: [Ruxley Gravel Pits, instanceOf, former gravel pit]
-
A.
former industrial plant
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
B.
former mining town
A former mining town is a community that once relied heavily on mineral extraction as its primary economic activity but has since seen its mines close, often leading to economic, social, and environmental transitions.
-
C.
tuff quarry
A tuff quarry is an excavation site where consolidated volcanic ash (tuff) is extracted for use as building stone, aggregate, or raw material in construction and industry.
-
D.
former village
A former village is a once-inhabited settlement that has lost its status or population as a village, often due to abandonment, depopulation, or administrative reclassification.
-
E.
pond
A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88a1626548190ae59a5028c3baa8e |
completed | March 4, 2026, 7:37 p.m. |
Created at: March 4, 2026, 7:44 p.m.