Triple

T21292665
Position Surface form Disambiguated ID Type / Status
Subject Azilal Province E524834 entity
Predicate contains P35 FINISHED
Object Bin el Ouidane Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bin el Ouidane Dam | Statement: [Azilal Province, contains, Bin el Ouidane Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bin el Ouidane Dam
Context triple: [Azilal Province, contains, Bin el Ouidane Dam]
  • A. Bin el Ouidane Dam chosen
    Bin el Ouidane Dam is a large hydroelectric and irrigation dam in central Morocco, renowned for creating Lake Bin el Ouidane and supporting regional agriculture and power generation.
  • B. Al Massira Dam
    Al Massira Dam is a major Moroccan dam and reservoir on the Oum Er-Rbia River, primarily used for hydroelectric power generation, irrigation, and water supply.
  • C. Qaraoun Dam
    Qaraoun Dam is a major concrete dam in Lebanon that creates Lake Qaraoun, serving as a key source of hydroelectric power, irrigation, and water storage for the Litani River basin.
  • D. Khashm el-Girba Dam
    Khashm el-Girba Dam is a major embankment dam in eastern Sudan that provides irrigation water, hydroelectric power, and flood control along the Atbara River.
  • E. Gibe II Dam
    Gibe II Dam is a hydroelectric power facility in Ethiopia that harnesses the flow of the Omo River to generate electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b517e6748190850d6f6ddf323d69 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e73855e5d08190aed5e285247b4e23 completed April 21, 2026, 8:41 a.m.
Created at: April 16, 2026, 4:04 p.m.