Triple

T21291266
Position Surface form Disambiguated ID Type / Status
Subject Francesco Zolla E524795 entity
Predicate notableWork P4 FINISHED
Object Zola dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zola dam | Statement: [Francesco Zolla, notableWork, Zola dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zola dam
Context triple: [Francesco Zolla, notableWork, Zola dam]
  • A. Zola Dam chosen
    Zola Dam is a 19th-century hydraulic engineering project in Aix-en-Provence, France, designed by engineer François Zola and notable as an early example of modern dam construction.
  • B. Sautet Dam
    Sautet Dam is a hydroelectric dam on the Drac River in southeastern France, known for forming the Lac du Sautet reservoir amid dramatic Alpine scenery.
  • C. Loskop Dam
    Loskop Dam is a large concrete arch-gravity dam on the Olifants River in South Africa, primarily used for irrigation, water supply, and recreation.
  • D. Chivero Dam
    Chivero Dam is a major reservoir in Zimbabwe that supplies water to Harare and supports recreation, fishing, and wildlife in the surrounding Lake Chivero Recreational Park.
  • E. Gariep Dam
    Gariep Dam is South Africa’s largest storage reservoir, situated on the Orange River and serving as a key source of water, hydroelectric power, and recreation for the surrounding regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5171f6c8190a5d57201ede73811 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736da28648190ae3f63c6ba1f6d6f completed April 21, 2026, 8:35 a.m.
Created at: April 16, 2026, 4:04 p.m.