Triple

T21275558
Position Surface form Disambiguated ID Type / Status
Subject Smøla E524377 entity
Predicate windFarmOperator P143469 FINISHED
Object Statkraft NE NERFINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Statkraft | Statement: [Smøla, windFarmOperator, Statkraft]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Statkraft
Context triple: [Smøla, windFarmOperator, Statkraft]
  • A. Skagerak Energi
    Skagerak Energi is a Norwegian energy company that produces and distributes electricity, primarily in the Telemark and Vestfold regions.
  • B. Ørsted
    Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
  • C. Ørsted
    Ørsted is a small Danish town located in Norddjurs Municipality on the Jutland peninsula.
  • D. Vattenfall
    Vattenfall is a Swedish state-owned energy company that is one of Europe’s largest producers and distributors of electricity and heat, with a significant focus on renewable energy such as wind power.
  • E. Skellefteå Kraft
    Skellefteå Kraft is a Swedish energy company that produces and supplies electricity and related energy services, particularly in the Skellefteå region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Statkraft
Target entity description: Statkraft is a Norwegian state-owned energy company and one of Europe’s largest producers of renewable power, particularly known for its hydropower and wind power operations.
  • A. Skagerak Energi
    Skagerak Energi is a Norwegian energy company that produces and distributes electricity, primarily in the Telemark and Vestfold regions.
  • B. Ørsted
    Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
  • C. Ørsted
    Ørsted is a small Danish town located in Norddjurs Municipality on the Jutland peninsula.
  • D. Vattenfall
    Vattenfall is a Swedish state-owned energy company that is one of Europe’s largest producers and distributors of electricity and heat, with a significant focus on renewable energy such as wind power.
  • E. Skellefteå Kraft
    Skellefteå Kraft is a Swedish energy company that produces and supplies electricity and related energy services, particularly in the Skellefteå region.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: windFarmOperator
Context triple: [Smøla, windFarmOperator, Statkraft]
  • A. windFarmCapacity
    Indicates the total power generation capacity of a wind farm, typically measured in units such as megawatts.
  • B. hasWindFarm
    Indicates that one entity possesses, hosts, or contains a wind farm as part of its assets, infrastructure, or territory.
  • C. windResource
    Indicates the availability, quality, or characteristics of wind at a location as a usable energy resource.
  • D. windEnergyDevelopment
    Indicates the development, construction, or expansion of facilities and infrastructure for generating energy from wind.
  • E. windResourceAreaPeers
    Indicates that two or more wind resource areas are considered peers, typically meaning they are comparable or related in terms of characteristics, status, or evaluation context.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736577fd48190a0038a6ac5678668 completed April 21, 2026, 8:33 a.m.
PD Predicate disambiguation batch_69e5f6161dac8190b06009cd180e3ff7 completed April 20, 2026, 9:47 a.m.
PDg Predicate description generation batch_69e5f9943ed881909ef49045c5bcf6df completed April 20, 2026, 10:01 a.m.
Created at: April 16, 2026, 4:02 p.m.