Triple

T21275557
Position Surface form Disambiguated ID Type / Status
Subject Smøla E524377 entity
Predicate hasWindFarm P34328 FINISHED
Object Smøla Wind Farm NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Smøla Wind Farm | Statement: [Smøla, hasWindFarm, Smøla Wind Farm]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Smøla Wind Farm
Context triple: [Smøla, hasWindFarm, Smøla Wind Farm]
  • A. Storheia wind farm
    Storheia wind farm is a large onshore wind power facility in the Fosen region of Norway, known as one of the country’s biggest wind farms and a focal point in debates over renewable energy and Indigenous Sámi reindeer herding rights.
  • B. Kvenndalsfjellet wind farm
    Kvenndalsfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • C. Harbaksfjellet wind farm
    Harbaksfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • D. Fosen Vind
    Fosen Vind is a large onshore wind power project in Norway, comprising multiple wind farms and ranking among Europe’s biggest wind energy developments.
  • E. Fosen Vind project
    The Fosen Vind project is a large onshore wind power development in Norway, comprising multiple wind farms and representing one of Europe’s biggest land-based renewable energy initiatives.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Smøla Wind Farm
Target entity description: Smøla Wind Farm is one of Norway’s largest onshore wind power installations, located on the island of Smøla and known for its significant renewable energy production and research on wind power’s environmental impacts.
  • A. Storheia wind farm
    Storheia wind farm is a large onshore wind power facility in the Fosen region of Norway, known as one of the country’s biggest wind farms and a focal point in debates over renewable energy and Indigenous Sámi reindeer herding rights.
  • B. Kvenndalsfjellet wind farm
    Kvenndalsfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • C. Harbaksfjellet wind farm
    Harbaksfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • D. Fosen Vind
    Fosen Vind is a large onshore wind power project in Norway, comprising multiple wind farms and ranking among Europe’s biggest wind energy developments.
  • E. Fosen Vind project
    The Fosen Vind project is a large onshore wind power development in Norway, comprising multiple wind farms and representing one of Europe’s biggest land-based renewable energy initiatives.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736577fd48190a0038a6ac5678668 completed April 21, 2026, 8:33 a.m.
Created at: April 16, 2026, 4:02 p.m.