Triple

T21259907
Position Surface form Disambiguated ID Type / Status
Subject Ben Cruachan E523969 entity
Predicate hasStructure P35 FINISHED
Object Cruachan Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cruachan Power Station | Statement: [Ben Cruachan, hasStructure, Cruachan Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cruachan Power Station
Context triple: [Ben Cruachan, hasStructure, Cruachan Power Station]
  • A. Clunie power station
    Clunie power station is a hydroelectric power facility in Scotland that harnesses the flow of the River Tummel to generate electricity.
  • B. Huntly Power Station
    Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
  • C. Pitlochry Power Station
    Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
  • D. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • E. Callide Power Station
    Callide Power Station is a coal-fired power station in Central Queensland, Australia, that supplies electricity to the regional and national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Cruachan Power Station
Target entity description: Cruachan Power Station is a pumped-storage hydroelectric power facility built inside Ben Cruachan in Scotland, serving as a major source of grid energy storage and peak-time electricity generation.
  • A. Clunie power station
    Clunie power station is a hydroelectric power facility in Scotland that harnesses the flow of the River Tummel to generate electricity.
  • B. Huntly Power Station
    Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
  • C. Pitlochry Power Station
    Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
  • D. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • E. Callide Power Station
    Callide Power Station is a coal-fired power station in Central Queensland, Australia, that supplies electricity to the regional and national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5156d7881909bd4f83676590715 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e735e53df88190bd6024793a0ada08 completed April 21, 2026, 8:31 a.m.
Created at: April 16, 2026, 3:59 p.m.