Triple

T21259906
Position Surface form Disambiguated ID Type / Status
Subject Ben Cruachan E523969 entity
Predicate hasStructure P35 FINISHED
Object Cruachan Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cruachan Dam | Statement: [Ben Cruachan, hasStructure, Cruachan Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cruachan Dam
Context triple: [Ben Cruachan, hasStructure, Cruachan Dam]
  • A. Cruachan Dam chosen
    Cruachan Dam is a large hydroelectric power station and reservoir in the Scottish Highlands, known for its pumped-storage scheme built inside Ben Cruachan mountain.
  • B. Pitlochry Dam
    Pitlochry Dam is a mid-20th-century hydroelectric dam on the River Tummel in Scotland, noted for its power station and popular salmon ladder attraction.
  • C. Aviemore Dam
    Aviemore Dam is a major hydroelectric dam in New Zealand’s South Island, forming Lake Aviemore as part of the Waitaki River power scheme.
  • D. Craig Goch Dam
    Craig Goch Dam is a stone-built, curved gravity dam in mid-Wales, often called the “top dam” of the Elan Valley reservoirs and noted for its picturesque setting and architectural elegance.
  • E. Rhodhiss Dam
    Rhodhiss Dam is a hydroelectric dam on the Catawba River in North Carolina that forms Lake Rhodhiss and helps provide power and water supply to the surrounding region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5156d7881909bd4f83676590715 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e735e53df88190bd6024793a0ada08 completed April 21, 2026, 8:31 a.m.
Created at: April 16, 2026, 3:59 p.m.