Triple
T21257443
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tarbert, County Kerry |
E523905
|
entity |
| Predicate | hasPowerStation |
P17850
|
FINISHED |
| Object | Tarbert Power Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tarbert Power Station | Statement: [Tarbert, County Kerry, hasPowerStation, Tarbert Power Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tarbert Power Station Context triple: [Tarbert, County Kerry, hasPowerStation, Tarbert Power Station]
-
A.
Peterhead Power Station
Peterhead Power Station is a major gas-fired power plant in Aberdeenshire, Scotland, known for its role in electricity generation and as a site for developing low-carbon and carbon capture technologies.
-
B.
Huntly Power Station
Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
-
C.
Cockenzie power station
Cockenzie power station was a large coal-fired power station in East Lothian, Scotland, that operated for several decades before its closure and demolition in the 2010s.
-
D.
Aviemore Power Station
Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
-
E.
Pitlochry Power Station
Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Tarbert Power Station Target entity description: Tarbert Power Station is an oil-fired electricity generating plant located near the village of Tarbert in County Kerry, Ireland.
-
A.
Peterhead Power Station
Peterhead Power Station is a major gas-fired power plant in Aberdeenshire, Scotland, known for its role in electricity generation and as a site for developing low-carbon and carbon capture technologies.
-
B.
Huntly Power Station
Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
-
C.
Cockenzie power station
Cockenzie power station was a large coal-fired power station in East Lothian, Scotland, that operated for several decades before its closure and demolition in the 2010s.
-
D.
Aviemore Power Station
Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
-
E.
Pitlochry Power Station
Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b5146c108190adc9adb73e90abff |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e735e2f1d48190b566ab4d736fdbc4 |
completed | April 21, 2026, 8:31 a.m. |
Created at: April 16, 2026, 3:58 p.m.