Triple

T21254033
Position Surface form Disambiguated ID Type / Status
Subject Sag Harbor Cove E523818 entity
Predicate instanceOf P0 FINISHED
Object boating harbor C16012 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: boating harbor
Context triple: [Sag Harbor Cove, instanceOf, boating harbor]
  • A. boatyard
    A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
  • B. public boating facility
    A public boating facility is a designated area with infrastructure and services that provide public access to waterways for launching, docking, and maintaining recreational or commercial boats.
  • C. boathouse
    A boathouse is a waterside structure designed for storing, sheltering, and maintaining boats and related equipment, often providing direct access to a lake, river, or sea.
  • D. coastal harbour chosen
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • E. wharves
    Wharves are structures built along a shoreline or projecting into a body of water where ships can dock to load and unload cargo or passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5146c108190adc9adb73e90abff completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:57 p.m.