Triple
T2123484
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mulberry Grove Plantation |
E43977
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rice plantation |
C5188
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rice plantation Context triple: [Mulberry Grove Plantation, instanceOf, rice plantation]
-
A.
planter
A planter is a container or structure designed to hold soil and support the growth of plants, often used for decorative or space-saving gardening.
-
B.
agricultural colony
An agricultural colony is a settlement established primarily to cultivate land and produce food or raw materials, often organized around farming as its central economic and social activity.
-
C.
commodity crop
A commodity crop is a large-scale agricultural product, such as corn, soybeans, or wheat, grown primarily for sale on national or global markets rather than for local consumption or specialized uses.
-
D.
plantation owner
A plantation owner is an individual who possesses and manages a large agricultural estate, historically relying on coerced or enslaved labor to cultivate cash crops for profit.
-
E.
farm
chosen
A farm is a tract of land and its associated buildings, equipment, and living organisms used for the cultivation of crops and/or the raising of animals for food, fiber, or other agricultural products.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88717cfe48190b7ecdd68c824848a |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:44 p.m.