Triple

T21213784
Position Surface form Disambiguated ID Type / Status
Subject Truckee River Operating Agreement E522784 entity
Predicate affects P9 FINISHED
Object Boca Reservoir NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boca Reservoir | Statement: [Truckee River Operating Agreement, affects, Boca Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boca Reservoir
Context triple: [Truckee River Operating Agreement, affects, Boca Reservoir]
  • A. Boca Reservoir chosen
    Boca Reservoir is a man-made lake in Nevada County, California, used primarily for water storage, flood control, and recreation as part of the Truckee River system.
  • B. San Vicente Reservoir
    San Vicente Reservoir is a major water storage lake in San Diego County, California, used for municipal water supply and popular for recreational activities like boating and fishing.
  • C. El Pardo Reservoir
    El Pardo Reservoir is a dammed water body near Madrid, Spain, primarily used for water supply, flood control, and recreation along the Manzanares River.
  • D. Lima Reservoir
    Lima Reservoir is a man-made lake in southwestern Montana used primarily for irrigation, recreation, and local water storage.
  • E. Carmen Reservoir
    Carmen Reservoir is a man-made lake on the McKenzie River in Oregon, primarily used for hydroelectric power generation and recreation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b511ed84819099b449b4a111085c completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7347088488190aa764b3f4bbac44d completed April 21, 2026, 8:25 a.m.
Created at: April 16, 2026, 3:39 p.m.