Triple

T21192196
Position Surface form Disambiguated ID Type / Status
Subject SMSC E522239 entity
Predicate instanceOf P0 FINISHED
Object mobile network infrastructure component C18460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mobile network infrastructure component
Context triple: [SMSC, instanceOf, mobile network infrastructure component]
  • A. telecommunications infrastructure component
    A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
  • B. internet infrastructure component
    An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
  • C. telecommunications network function chosen
    A telecommunications network function is a modular, software- or hardware-based component that performs a specific networking role—such as routing, switching, or security—within a telecom infrastructure to enable end-to-end communication services.
  • D. telecommunications network
    A telecommunications network is a system of interconnected nodes, transmission media, and protocols that enables the exchange of voice, data, and multimedia information between users and devices over distance.
  • E. network management system component
    A network management system component is a modular software or hardware element that monitors, controls, and optimizes specific aspects of a network’s performance, configuration, security, or fault handling within an overall management framework.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51061388190aa03f19700d3ef04 completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:07 p.m.