Triple

T21192069
Position Surface form Disambiguated ID Type / Status
Subject IMT-TC E522235 entity
Predicate instanceOf P0 FINISHED
Object terrestrial component of IMT-2000 C44323 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: terrestrial component of IMT-2000
Context triple: [IMT-TC, instanceOf, terrestrial component of IMT-2000]
  • A. terrestrial navigation system
    A terrestrial navigation system is a ground-based infrastructure and associated equipment that determine a vehicle’s position, velocity, and course using signals or references located on or near the Earth’s surface.
  • B. GNSS reference network
    A GNSS reference network is a coordinated system of continuously operating GNSS stations that provide precise, stable positioning and timing references for surveying, navigation, and geospatial applications.
  • C. component of CTBT verification regime
    A component of the CTBT verification regime is an institutional, technical, or procedural element—such as monitoring systems, data analysis centers, or on-site inspections—that collectively ensure compliance with and detection of nuclear test activities under the Comprehensive Nuclear-Test-Ban Treaty.
  • D. military bridge-layer system
    A military bridge-layer system is an armored, mobile engineering vehicle designed to rapidly deploy and retrieve temporary bridges to enable troops and vehicles to cross obstacles in combat environments.
  • E. GPRS packet control unit implementation
    A GPRS packet control unit implementation is the software and hardware logic that manages radio resource allocation, packet scheduling, and data flow control between mobile stations and the core network in a GPRS system.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51061388190aa03f19700d3ef04 completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:07 p.m.