Triple

T21192041
Position Surface form Disambiguated ID Type / Status
Subject IMT-MC E522234 entity
Predicate instanceOf P0 FINISHED
Object 3G standard C2787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 3G standard
Context triple: [IMT-MC, instanceOf, 3G standard]
  • A. 3GPP standardized parameter
    A 3GPP standardized parameter is a formally defined technical value or setting specified by the 3rd Generation Partnership Project to ensure interoperability, performance, and compliance across mobile communication systems and equipment.
  • B. telecommunications standard chosen
    A telecommunications standard is an agreed-upon set of technical specifications and protocols that ensure compatibility, interoperability, and reliable communication across different telecom networks and devices.
  • C. GSM blend
    A GSM blend is a red wine made primarily from Grenache, Syrah, and Mourvèdre grapes, combining Grenache’s fruitiness, Syrah’s spice and structure, and Mourvèdre’s earthy depth.
  • D. feature phone
    A feature phone is a mobile device that offers basic calling and texting capabilities along with limited multimedia and internet functions, without the advanced operating systems and app ecosystems of smartphones.
  • E. Symbian platform
    Symbian platform is a mobile operating system and software platform designed primarily for smartphones, offering a multitasking environment and support for native and third-party applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51061388190aa03f19700d3ef04 completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:07 p.m.