Triple

T21167767
Position Surface form Disambiguated ID Type / Status
Subject Dauphin Island Bridge E521612 entity
Predicate carries P1393 FINISHED
Object Alabama State Route 193 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alabama State Route 193 | Statement: [Dauphin Island Bridge, carries, Alabama State Route 193]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Alabama State Route 193
Context triple: [Dauphin Island Bridge, carries, Alabama State Route 193]
  • A. Alabama State Route 193 chosen
    Alabama State Route 193 is a state highway in Mobile County that connects the Theodore area to Dauphin Island and other nearby coastal communities.
  • B. Alabama State Route 191
    Alabama State Route 191 is a state highway in Alabama that serves as a local connector route within Chilton County.
  • C. Alabama State Route 199
    Alabama State Route 199 is a state highway in Alabama that serves as a regional connector route within Macon County and its surrounding area.
  • D. Alabama State Route 189
    Alabama State Route 189 is a state highway in Alabama that serves as a regional connector route within the state's transportation network.
  • E. Alabama State Route 183
    Alabama State Route 183 is a state highway in Alabama that serves as a regional connector route, running through rural areas including parts of Chilton County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50e30748190b186824a206d39b9 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7270fce708190a5715b55b406dd4e completed April 21, 2026, 7:28 a.m.
Created at: April 16, 2026, 3 p.m.