Triple

T21166645
Position Surface form Disambiguated ID Type / Status
Subject Palacký Bridge E521580 entity
Predicate partOf P40 FINISHED
Object Prague bridge network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Prague bridge network | Statement: [Palacký Bridge, partOf, Prague bridge network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Prague bridge network
Context triple: [Palacký Bridge, partOf, Prague bridge network]
  • A. Prague public transport network
    The Prague public transport network is an extensive integrated system of metro lines, trams, buses, ferries, and funiculars that provides comprehensive urban and suburban transit throughout the Czech capital and its surrounding areas.
  • B. Brno ring road bridges
    The Brno ring road bridges are a series of major highway structures forming part of Brno’s orbital road system, carrying traffic over the Svratka River and surrounding terrain to improve regional connectivity and bypass city congestion.
  • C. Munich bridge network
    The Munich bridge network is the interconnected system of bridges spanning the Isar River and other waterways in Munich, facilitating urban transport and linking the city’s districts.
  • D. Prague trade routes
    Prague trade routes were the historical network of commercial pathways that made Prague a major Central European hub for long-distance trade and economic exchange.
  • E. Havelian bridge
    Havelian bridge is a road bridge in the Havelian area of Khyber Pakhtunkhwa, Pakistan, serving as a key crossing and transport link in the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Prague bridge network
Target entity description: The Prague bridge network is the interconnected system of road, rail, and pedestrian bridges spanning the Vltava River that links together the districts of Prague and forms a key part of the city’s transport infrastructure and urban landscape.
  • A. Prague public transport network
    The Prague public transport network is an extensive integrated system of metro lines, trams, buses, ferries, and funiculars that provides comprehensive urban and suburban transit throughout the Czech capital and its surrounding areas.
  • B. Brno ring road bridges
    The Brno ring road bridges are a series of major highway structures forming part of Brno’s orbital road system, carrying traffic over the Svratka River and surrounding terrain to improve regional connectivity and bypass city congestion.
  • C. Munich bridge network
    The Munich bridge network is the interconnected system of bridges spanning the Isar River and other waterways in Munich, facilitating urban transport and linking the city’s districts.
  • D. Prague trade routes
    Prague trade routes were the historical network of commercial pathways that made Prague a major Central European hub for long-distance trade and economic exchange.
  • E. Havelian bridge
    Havelian bridge is a road bridge in the Havelian area of Khyber Pakhtunkhwa, Pakistan, serving as a key crossing and transport link in the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50e30748190b186824a206d39b9 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7270fce708190a5715b55b406dd4e completed April 21, 2026, 7:28 a.m.
Created at: April 16, 2026, 2:59 p.m.