Triple

T21145875
Position Surface form Disambiguated ID Type / Status
Subject Lochaline silica sand mine E521053 entity
Predicate instanceOf P0 FINISHED
Object silica sand mine C43242 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: silica sand mine
Context triple: [Lochaline silica sand mine, instanceOf, silica sand mine]
  • A. lithium mine
    A lithium mine is an industrial site where lithium-bearing minerals or brines are extracted, processed, and refined for use in batteries and other technological applications.
  • B. sandstone quarry
    A sandstone quarry is an open-pit excavation site where sandstone rock is extracted from the earth for use in construction, architecture, and industrial applications.
  • C. molybdenum mine
    A molybdenum mine is an industrial site where molybdenum-bearing ores are extracted, processed, and refined for use in steel alloys, catalysts, and high-temperature applications.
  • D. quarry chosen
    A quarry is an open-pit site where stone, rock, sand, gravel, or minerals are extracted from the earth for construction and industrial use.
  • E. silver mine
    A silver mine is an industrial site where silver-bearing ore is extracted from the earth, processed, and refined into usable silver.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50c6a848190a4e525a77a319b8a completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 2:58 p.m.