Triple

T21144784
Position Surface form Disambiguated ID Type / Status
Subject Iran–Armenia relations E521023 entity
Predicate hasEnergyProject P14971 FINISHED
Object Iran–Armenia gas pipeline NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iran–Armenia gas pipeline | Statement: [Iran–Armenia relations, hasEnergyProject, Iran–Armenia gas pipeline]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Iran–Armenia gas pipeline
Context triple: [Iran–Armenia relations, hasEnergyProject, Iran–Armenia gas pipeline]
  • A. Baku–Tbilisi–Ceyhan pipeline
    The Baku–Tbilisi–Ceyhan pipeline is a major crude oil pipeline that transports Caspian Sea oil from Azerbaijan through Georgia to the Mediterranean coast of Turkey for export to global markets.
  • B. South Caucasus Pipeline
    The South Caucasus Pipeline is a major natural gas pipeline transporting Caspian gas from Azerbaijan through Georgia to Turkey, forming a key component of the Southern Gas Corridor to Europe.
  • C. Bovanenkovo–Ukhta gas pipeline
    The Bovanenkovo–Ukhta gas pipeline is a major Russian natural gas transmission line that transports gas from the Yamal Peninsula’s Bovanenkovo field toward central Russia and European markets.
  • D. West–East Gas Pipeline
    The West–East Gas Pipeline is a major Chinese natural gas transmission project that transports gas from resource-rich western regions to energy-consuming eastern and coastal areas, supporting national economic development and energy security.
  • E. Iran–Armenia corridor
    The Iran–Armenia corridor is a key international transport route linking Iran with Armenia and, by extension, the South Caucasus and Eurasian markets.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Iran–Armenia gas pipeline
Target entity description: The Iran–Armenia gas pipeline is a cross-border natural gas pipeline that supplies Iranian gas to Armenia, enhancing the two countries’ energy cooperation and regional connectivity.
  • A. Baku–Tbilisi–Ceyhan pipeline
    The Baku–Tbilisi–Ceyhan pipeline is a major crude oil pipeline that transports Caspian Sea oil from Azerbaijan through Georgia to the Mediterranean coast of Turkey for export to global markets.
  • B. South Caucasus Pipeline
    The South Caucasus Pipeline is a major natural gas pipeline transporting Caspian gas from Azerbaijan through Georgia to Turkey, forming a key component of the Southern Gas Corridor to Europe.
  • C. Bovanenkovo–Ukhta gas pipeline
    The Bovanenkovo–Ukhta gas pipeline is a major Russian natural gas transmission line that transports gas from the Yamal Peninsula’s Bovanenkovo field toward central Russia and European markets.
  • D. West–East Gas Pipeline
    The West–East Gas Pipeline is a major Chinese natural gas transmission project that transports gas from resource-rich western regions to energy-consuming eastern and coastal areas, supporting national economic development and energy security.
  • E. Iran–Armenia corridor
    The Iran–Armenia corridor is a key international transport route linking Iran with Armenia and, by extension, the South Caucasus and Eurasian markets.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50c6a848190a4e525a77a319b8a completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e723fcdb7c8190ae04d6ad9dff3187 completed April 21, 2026, 7:15 a.m.
Created at: April 16, 2026, 2:57 p.m.