Triple

T21143422
Position Surface form Disambiguated ID Type / Status
Subject London Air Traffic Control Centre E520989 entity
Predicate instanceOf P0 FINISHED
Object air traffic control centre C3808 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: air traffic control centre
Context triple: [London Air Traffic Control Centre, instanceOf, air traffic control centre]
  • A. air traffic control tower
    A structure at an airport from which air traffic controllers monitor and direct aircraft movements on the ground and in the airspace around the airport to ensure safe and efficient operations.
  • B. air navigation organization chosen
    An air navigation organization is an entity responsible for planning, managing, and controlling the safe and efficient movement of aircraft through designated airspace using air traffic services, communication, navigation, and surveillance systems.
  • C. air traffic management systems manufacturer
    A company that designs, develops, and produces integrated systems and technologies used to monitor, control, and optimize the safe and efficient movement of aircraft in airspace and at airports.
  • D. command and control centre
    A command and control centre is a centralized facility where information is collected, analyzed, and used to coordinate and direct operations, resources, and decision-making in real time.
  • E. deployable air command and control centre
    A deployable air command and control centre is a mobile, rapidly configurable facility that provides the infrastructure, systems, and personnel needed to plan, direct, and coordinate air operations in a given theater.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50c6a848190a4e525a77a319b8a completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 2:57 p.m.