Triple

T21140527
Position Surface form Disambiguated ID Type / Status
Subject Brazilian Carnival E520914 entity
Predicate instanceOf P0 FINISHED
Object public holiday period C288 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public holiday period
Context triple: [Brazilian Carnival, instanceOf, public holiday period]
  • A. public holiday chosen
    A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
  • B. public holiday system
    A public holiday system manages, stores, and provides access to information about official holidays, including their dates, types, and applicable regions, to support scheduling, compliance, and planning activities.
  • C. local holiday
    A local holiday is a day of celebration or observance recognized and typically granted time off only within a specific city, region, or locality rather than an entire country.
  • D. holiday standard
    A holiday standard is a widely recognized and repeatedly celebrated song, film, or tradition that recurs each holiday season and is culturally regarded as timeless.
  • E. package holiday provider
    A package holiday provider is a company that bundles and sells complete vacation packages, typically including transport, accommodation, and sometimes activities or meals, for a single combined price.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50b53048190ae34e8abbe3c5ada completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 2:57 p.m.