Triple

T21135263
Position Surface form Disambiguated ID Type / Status
Subject Cloyne, Ontario E520798 entity
Predicate transportationRoute P11026 FINISHED
Object Highway 41 corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Highway 41 corridor | Statement: [Cloyne, Ontario, transportationRoute, Highway 41 corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Highway 41 corridor
Context triple: [Cloyne, Ontario, transportationRoute, Highway 41 corridor]
  • A. Highway 410
    Highway 410 is a major controlled-access freeway in Ontario, Canada, that connects the city of Mississauga to Brampton and links to other key routes in the Greater Toronto Area.
  • B. Highway 4 corridor
    The Highway 4 corridor is a scenic transportation route in California’s Sierra Nevada region, known for connecting historic Gold Country towns, wineries, and mountain recreation areas.
  • C. Highway 17 corridor
    The Highway 17 corridor is a major mountain pass route in California that connects the Santa Cruz area with Silicon Valley, serving as a key commuter and regional traffic artery.
  • D. Highway 11 corridor
    The Highway 11 corridor is a major transportation route in Ontario that connects communities like Oro-Medonte to larger regional and provincial road networks.
  • E. Highway 60 corridor
    The Highway 60 corridor is the main east–west road and visitor access route running through the southern portion of Algonquin Provincial Park, lined with campgrounds, trails, and scenic viewpoints.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Highway 41 corridor
Target entity description: The Highway 41 corridor is a key north–south transportation route in eastern Ontario that connects small rural communities like Cloyne to larger regional centers.
  • A. Highway 410
    Highway 410 is a major controlled-access freeway in Ontario, Canada, that connects the city of Mississauga to Brampton and links to other key routes in the Greater Toronto Area.
  • B. Highway 4 corridor
    The Highway 4 corridor is a scenic transportation route in California’s Sierra Nevada region, known for connecting historic Gold Country towns, wineries, and mountain recreation areas.
  • C. Highway 17 corridor
    The Highway 17 corridor is a major mountain pass route in California that connects the Santa Cruz area with Silicon Valley, serving as a key commuter and regional traffic artery.
  • D. Highway 11 corridor
    The Highway 11 corridor is a major transportation route in Ontario that connects communities like Oro-Medonte to larger regional and provincial road networks.
  • E. Highway 60 corridor
    The Highway 60 corridor is the main east–west road and visitor access route running through the southern portion of Algonquin Provincial Park, lined with campgrounds, trails, and scenic viewpoints.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50b53048190ae34e8abbe3c5ada completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e723592fd48190ba5977a1b229d51e completed April 21, 2026, 7:12 a.m.
Created at: April 16, 2026, 2:57 p.m.