Triple

T21128840
Position Surface form Disambiguated ID Type / Status
Subject Outokumpu stainless steel industry in Tornio E520629 entity
Predicate instanceOf P0 FINISHED
Object stainless steel plant C4731 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: stainless steel plant
Context triple: [Outokumpu stainless steel industry in Tornio, instanceOf, stainless steel plant]
  • A. industrial plant
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • B. manufacturing plant chosen
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • C. integrated steel mill
    An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
  • D. steel
    Steel is a strong, durable alloy primarily composed of iron and carbon, widely used in construction, manufacturing, and tools due to its high tensile strength and versatility.
  • E. steel finishing facility
    A steel finishing facility is an industrial plant where semi-finished steel products undergo surface treatment, coating, cutting, and other final processing steps to meet specific quality, dimensional, and performance requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50b53048190ae34e8abbe3c5ada completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 2:56 p.m.