Triple
T2111008
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Croton Aqueduct |
E42501
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water supply tunnel |
C8199
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water supply tunnel Context triple: [New Croton Aqueduct, instanceOf, water supply tunnel]
-
A.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
B.
water supply system
A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
-
C.
road tunnel
A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
-
D.
rail tunnel
A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
-
E.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8871040f08190aac2e2d0ab6b47ad |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:43 p.m.