Triple

T2109061
Position Surface form Disambiguated ID Type / Status
Subject The Life of Klim Samgin E42461 entity
Predicate incomplete P18162 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [The Life of Klim Samgin, incomplete, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: incomplete
Context triple: [The Life of Klim Samgin, incomplete, true]
  • A. unfinished chosen
    Indicates that an action, process, or state has started but has not yet been completed.
  • B. notFullyIncorporated
    Indicates that one entity has not been completely integrated, absorbed, or merged into another entity or system.
  • C. doesNotFullyExplain
    Indicates that one entity’s explanation of another entity, event, or situation is incomplete or insufficient to account for it fully.
  • D. cannot
    Indicates that one entity lacks the ability, permission, or possibility to perform an action or participate in a specified relationship with another entity.
  • E. includes
    Indicates that one entity contains, encompasses, or has another entity as a part, member, or subset.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8871040f08190aac2e2d0ab6b47ad completed March 4, 2026, 7:25 p.m.
NER Named-entity recognition batch_69abbae1bacc8190beffc9d0470e9190 completed March 7, 2026, 5:42 a.m.
PD Predicate disambiguation batch_69abb7ba08948190a3c236bb53ee4257 completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:43 p.m.